Innovative Cable Lay System delivered on CLV Nexans Aurora


8th June 2021


MAATS have completed installation and commissioning of the cable lay equipment supplied to the state-of-the-art cable lay vessel Nexans Aurora which has been delivered to Nexans ahead of its maiden project.

The carousel and cable lay system (CLS) has been designed by MAATS in close consultation with vessel owners Nexans Subsea Operations AS, ship designers Skipsteknisk AS, and shipyard Ulstein Verft AS. It consists of an on-deck, concentric, 10,000Te carousel and two separate firing line deck spread systems one line utilising a capstan lay solution while the other adopts the use of two twin-track 25t Tensioners (each providing four points of contact to the product). The CLS is complemented with a range of heavy duty roller pathways, two loading arms and stern lay wheels, all of which help enable laying in deep water, in harsh conditions and rough weather.

Nexans Aurora_View into Basket

Nexans chose the ground-breaking concentric carousel design as it best suited the deep water lay capabilities and enables the vessel to choose between a single cable load of up to 10,000t, or dual lay capability with up to 5,000t in each basket.

MAATS has enjoyed a close collaborative relationship with Nexans and look forward to continuing to support the service and maintenance of the system as the vessel continues to win and deliver its contracts worldwide.